Operating as subcontractor under CGGC/GKI, our site teams verified high-density polyethylene pontoon strings and deep-water anchor mooring systems designed to withstand seasonal reservoir water level shifts exceeding twenty meters.
Every centralized inverter skiff and medium-voltage underwater cable termination underwent rigorous tension testing and third-party inspection protocols prior to substation energization.






Site Assembly Archive
Systematic technical imaging verifying structural tolerances, high-voltage equipment placement, and electrical routing across all reservoir sectors.
Field Execution Metrics
60 MWp
Generation Capacity
24 m
Reservoir Water Shift Range
130k+
HDPE Pontoons Assembled
Zero
Lost-Time Safety Incidents