Infrastructure Showcase

Saguling 60MW Floating PV

Delivering engineering, procurement, and construction management for Indonesia's landmark water-surface array, deployed under project ownership by PT PLN and ACWA Power.

Technical Scope

Mooring and Flotation Rigor

Operating as subcontractor under CGGC/GKI, our site teams verified high-density polyethylene pontoon strings and deep-water anchor mooring systems designed to withstand seasonal reservoir water level shifts exceeding twenty meters.

Every centralized inverter skiff and medium-voltage underwater cable termination underwent rigorous tension testing and third-party inspection protocols prior to substation energization.

Empirical Benchmarks

Field Execution Metrics

60 MWp

Generation Capacity

24 m

Reservoir Water Shift Range

130k+

HDPE Pontoons Assembled

Zero

Lost-Time Safety Incidents

Review Technical Documentation

Access detailed civil schematics, anchoring calculation dossiers, and quality assurance logs for upcoming utility tenders.